MIL-PRF-32001
Characteristic
Requirement
Verification
Characteristic
Requirement
Verification
Paragraph
Paragraph
Paragraph
Paragraph
Internal power
3.3.2
4.3.2
Vibration
3.4.3.1
4.4.3.1
system
Air flow
3.3.3
4.3.3
Shock
3.4.3.2
4.4.3.2
Frame/enclosure
3.3.4
4.3.4
Maintenance
3.4.4
4.4.4
Temperature
3.3.5
4.3.5
Identification and
3.4.5
4.4.5
resistance
marking
Reliability
3.3.6
4.3.6
3.5
4.5
Environmental
requirements
Safety
3.3.7
4.3.7
Salt fog
3.5.1
4.5.1
Sharp edges
3.3.7.1
4.3.7.1
Wind/rain
3.5.2
4.5.2
Moving parts
3.3.7.2
4.3.7.2
Storage
3.5.3
4.5.3
Safety label
3.3.7.3
4.3.7.3
Operating
3.5.4
4.5.4
temperature range
3.4
4.4
3.6
4.6
Support or
Interface & inter-
owner-ship
operability
requirements
requirements
Weight
3.4.1
4.4.1
Dimensions
3.6.1
4.6.1
4.1.2 Conformance inspection. Conformance inspections shall include tests 4.3.1, 4.3.2,
4.3.7.1, 4.3.7.2, 4.3.7.3, 4.4.1, 4.4.2, 4.4.5, and 4.6.1. Sampling for conformance inspections
shall be as specified in the contract or purchase order.
4.2 Verification methods. Verification methods can include visual examination, measurement,
testing, simulation, modeling, engineering evaluation, component properties analysis, certification
and similarity to previously approved or previously qualified designs.
4.2.1 Verification alternatives. The contractor may propose alternative test methods,
techniques, or equipment, including the application of statistical process control, tool control, or
cost effective sampling procedures to verify performance (see 6.4).
4.3 Operating requirements verification.
4.3.1 Controls and indicators inspection. Verify there are no user controls or indicators for
6